Improving Construction Management Practice in the Gibraltar Construction Industry
Daniel, Emmanuel I., Garcia, Daniel, Marasini, Ramesh, Kolo, Shaba and Oshodi, Olalekan (2019) Improving Construction Management Practice in the Gibraltar Construction Industry. 27th Annual Conference of the IGLC. pp. 539-550. ISSN 2309-0979
Full text not available from this repository. (Request a copy)Abstract
Research has shown that 57% of activities in a construction project is non-value adding (waste) which contributes to the poor performance of the sector. While other countries of the world such the USA, UK, Brazil, Nigeria and Israel among others are seeking to understand this challenge and deploy innovative ways and modern techniques to improve it, limited studies have explored factors that contribute to non-value adding activities (NVA) in the Gibraltar construction industry. The current study aims to identify the factors that contribute to NVA on construction sites in Gibraltar and to present an outlook on how this could be minimised using Last Planner System(LPS). A combination of quantative and qualitative research approaches were used. Thirtyone questionnaire responses were analysed and seven semi-structured interviews were conducted. The investigation reveals that the development of unrealistic schedules, lack of adequate training, delayed approval process and work interruption due to the community are the key factors that contribute to NVA. The study found that the suggestions offered by construction professional for minimising NVA align with some LPS principles. The study concludes that some of the current practices, could serve as justification for the introduction of LPS in the construction sector of Gibraltar.
Item Type: | Article |
---|---|
Depositing User: | RED Unit Admin |
Date Deposited: | 21 Oct 2019 12:33 |
Last Modified: | 05 Nov 2020 08:22 |
URI: | https://bnu.repository.guildhe.ac.uk/id/eprint/17873 |
Actions (login required)
Edit Item |